Total Plate's Facility Provides Enhanced Cost Savings Associated with the Transportation and Processing of Steel Plate

In addition to the blasting and priming services offered by Blastech Mobile, Total Plate’s strategically located facility provides enhanced cost savings associated with the transportation and processing of steel plate. Our recently expanded 45,000 square foot facility is equipped with a high-definition plasma compound beveling heads, an 88’ dry downdraft table, and a sophisticated 4-roll plate rolling system with tilting in-feed and out-feed tables to ensure repeatable, accurate, and low cost part production.  Click here to learn more. 


Corporate Offices

25000 Pitkin Road
Spring, TX 77386, USA
P: 832-299-3200

57 Old Onondaga Road West
Brantford, ON N3T 5M1, Canada
P: 519-756-8222
F: 519-753-1453
Toll Free: 1-877-252-7826

Worldwide Offices

The TF Warren Group in the world
  • United States
  • Canada
  • Colombia
  • Dominican Republic
  • Mexico
  • Panama
  • Puerto Rico