Scope of Work:
- 2.5 million gallon potable water reservoir
- Cathodic protection
- Exterior overcoat (epoxy/urethane)
Install operations:
- New spiral staircase
- New water quality sample station & interior tank piping
- New motor operated valves in the valve pit
- New altitude control piping
- New electrical service and RTU
- New roof hatches
Modifications / Repairs:
- Overflow piping modifications
- Electrical upgrades
- Interior cleaning & coating repairs
- Access road paving & curbs