
Scope of Work:
- Full removal of exterior lead based coating
- Recoating of tank exterior (epoxy/urethane system)
Install operations:
- Installed fall protection on roof
- New overflow piping
- New retaining wall & perimeter fencing
Modifications / Repairs:
- Replaced asphalt shingle roof & copper flashing
- Valve pit electrical improvements
- Repaved access road