Scope of Work:
- 14 million gallon storage tank
Install operations:
- Installed spiral staircase
- New roof vents
- New roof fan
- New roof fall protection
- New water quality sample station & piping
- New motor operated altitude control valve
- New roof hatch
- New RTU
Modifications / Repairs:
- Modified overflow piping & drain system
- Removed & replaced interior epoxy coating with 100% solids epoxy system
- Overcoated tank exterior (epoxy/urethane system)
- Cathodic protection
- Electrical improvements