Tarsco Contributes to 1.5 Million Man-hours Without a Lost Time Injury at Job in Rock Springs, WY
Tarsco contributes to 1.5 Million man-hours without a lost time Injury in the last month at their job in Rock Springs, WY. “I want to thank everybody that contributed to this mile stone and their safe work practice.” Ruben Verduzco, Safety Supervisor at the TF Warren Group. Great job Tarsco!
Premium Plate Project Located in Kershaw, SC
The Premium Plate project located in Kershaw, SC at the Halie Goldmine. Premium Plate supplied the material, it was blasted and primed through Blastech for the coating and white macropoxy was applied. We then processed the material at Total Plate. The processing included burning to size, beveling and rolling.
Tarsco Bolted Tank Completes Potable Water Tank in Highland, NC
Brant Corrosion Control Coating Stainless Steel Fresh Resin Tanks for Project in Citrus County, FL
Brant Corrosion Control is working on coating stainless steel, fresh resin tanks with carbon steel legs and supports. They are part of another in-house job for multiple spherical tanks destined for Duke Energy’s new combined-cycle natural gas plant in Citrus County, Florida. Our scope of work is to blast the exterior and coat only the carbon steel legs and supports, using a zinc-rich epoxy primer and polyurethane topcoat.