Contact TF Warren Group
Spring, TX: 832-299-3200
Brantford, ON: 519-756-8222

Tarsco Bolted Tank’s multi-million dollar equipment investments improve the complete manufacturing process offered on each project providing the safest construction crews, a high speed laser cutting system, and an enhanced state-of-the-art coating process.  

 

Tarsco Bolted Tank completed two dry bulk tanks for a project in Fargo, ND.  The tanks are erected from ground level with a jacking system, improving safety at the construction site.  This system eliminates expensive cranes and improves our ability to work in confined spaces. 

Brant Corrosion Control wrapped up the last four filters of a 12-piece project for a customer in Saudi Arabia. The interiors were lined with a general purpose semi-hard natural rubber. The exteriors were coated with inorganic zinc and finished with a high-build epoxy.

Tarsco, along with Blastco and Globaltherm, recently completed this four tank project located in Rock Springs, WY.  The project consisted of one ammonia tank, one demineralized water tank, and two fire water tanks. Globaltherm insulated the exterior of the ammonia tank shown, while Blastco blasted and primed with a SP10/NACE 2 blast, two coats of epoxy phenolic and the roof received two coats of epoxy.  

Blastech is processing a large volume of both small and large bore pipe. This project requires a high build epoxy phenolic lining for the interior. The exterior coating varies from either a standard epoxy or a zinc-rich epoxy with a polysiloxane topcoat based on indoor or outdoor installation at site.

 

Need Help Making a Decision?

Corporate offices
25000 Pitkin Road - Spring, TX 77386, United States
Phone: 866-700-2500
57 Old Onondaga Road West - Brantford, ON N3T 5M1, Canada
Phone: 519-756-8222
Fax: 519-753-1453
Toll Free: 1-877-252-7826