Tarsco, along with Blastco, is working on a rehabilitation project consisting of two tanks located in San Jose, CA. Tarsco has made multiple mechanical repairs on a 3 million gallon water tank and will begin work on the second tank. Blastco will be removing the existing coatings and applying a three coat Epoxy coating system to the interiors and a three coat Epoxy/Polyurethane coating system to the exteriors of both tanks.