Blastech to Complete Industrial Duct Project for Power Generation Facility

Blastech is nearing the end of an industrial ducting project. The project consisted of 62 large panels and miscellaneous small pieces. Each piece is abrasive blasted to SSPC-SP6 specification and primed. Once complete, all of the ducting will be shipped to the site where it will be installed in a power generation facility.