Total Plate's Facility Provides Enhanced Cost Savings Associated with the Transportation and Processing of Steel Plate

In addition to the blasting and priming services offered by Blastech Mobile, Total Plate’s strategically located facility provides enhanced cost savings associated with the transportation and processing of steel plate. Our recently expanded 45,000 square foot facility is equipped with a high-definition plasma compound beveling heads, an 88’ dry downdraft table, and a sophisticated 4-roll plate rolling system with tilting in-feed and out-feed tables to ensure repeatable, accurate, and low cost part production.  Click here to learn more.