Scope of Work:

  • Removal of two 10,000 and 3,000 BBL bolted galvanized salt water storage tanks
  • Installation of a new 10,000 BBL salt water storage tank

Install operations:

  • Installed internal cathodic protection system
  • Installed primary skim pump
  • All mechanical and electrical tie ins

Modifications / Repairs:

  • Sweep-blasted interior of new tank and applied epoxy phenolic interior coating system
  • Re-installed all tank appurtenances including stairway
  • All related site work including re-grading
  • All equipment, materials and construction spoils had to be moved to and from job site with barges due to facility being located on an island
  • All labor had to be boated to the island daily