Location: Miramichi New Brunswick
Scope of Work:
- 12 site lined & 1 shop lined thickener tanks
- Up to 30 meter diameters
- Project duration: 9 months
Interior
- SSPC-SP5/NACE 1
- 5 mm of bromobutyl rubber
- Heating/DH/Curing
- Process was 24/7 for entire project duration
- 130,000 sq.ft. of rubber applied
Exterior
- SSPC-SP10/NACE 2
- 8-10 mils of epoxy system