Location: Miramichi New Brunswick


Scope of Work:

  • 12 site lined & 1 shop lined thickener tanks
  • Up to 30 meter diameters
  • Project duration: 9 months

Interior

  • SSPC-SP5/NACE 1
  • 5 mm of bromobutyl rubber
  • Heating/DH/Curing
  • Process was 24/7 for entire project duration
  • 130,000 sq.ft. of rubber applied

Exterior

  • SSPC-SP10/NACE 2
  • 8-10 mils of epoxy system