Blastco Completes 16 Clarifier Project for Wastewater Treatment Facility in Los Angeles

 

Blastco completed a multi-year 16 clarifier project for a wastewater treatment facility in the Los Angeles area (adjacent to the Pacific Ocean).  The project consisted of (16) 120 ft. in diameter clarifiers in which the existing coating was removed by abrasive blasting. New epoxy coating was then applied to all submerged areas.  Blastco also blasted and painted the four walkways that exist in the center of each clarifier.